Design Review

DESIGN REVIEW SUBMITTAL PROCEDURES

PSUs and their Design Teams are responsible for making timely project review submittals and including adequate review periods when developing project schedules.  School Planning typically issues design review comments within 30 days of each design phase submittal.  Upon completion of the design review process, a Certificate of Review will be issued for the project.

ELECTRONIC SUBMITTAL of Design Review documents is REQUIRED

Please send all correspondence and design review submittals electronically – via email or download link – to Teri Williams at: teri.williams@dpi.nc.gov

When submitting design reviews, please provide 3 PDF files:

  1. DPI Project Transmittal Form
  2. Drawings
  3. Specifications
Electronic Design Review Submittal 
PDF format - DPI Transmittal, Drawings, SpecificationsElectronic Submittal

School Planning professionals conduct design reviews for new schools, additions, and renovations.  Design reviews ensure that school facilities accommodate modern educational program requirements.

Design reviews encompass code compliance, life safety, longevity, durability, economy, and efficiency of building construction systems.  Comments address local program flexibility while providing accountability with regard to the North Carolina Public Schools Facilities Guidelines.

Design review conferences are available at each design phase, offering design teams and school administrators the opportunity to meet with the School Planning staff of architects, engineers, and programmatic specialists.

Tab/Accordion Items

ELECTRONIC SUBMITTAL of Design Reviews is now REQUIRED

Please send all correspondence and design review submittals electronically – via email or download link – to Teri Williams at:  teri.williams@dpi.nc.gov

Submittal Materials

SD Phase
  • Project Submittal Form (PDF format)
  • Drawings (single PDF file)
  • Specifications or Design Narrative (single PDF file)
DD Phase
  • Project Submittal Form (PDF format)
  • Written Responses to SD Review Comments (PDF format)
  • Drawings (single PDF file)
  • Specifications (single PDF file)
CD Phase
  • Project Submittal Form (PDF format)
  • Written Responses to DD Review Comments (PDF format)
  • Drawings (single PDF file)
  • Specifications (single PDF file)

Architecture / Site Design
Media Center Design
Structural Engineering
Mechanical Engineering
Electrical Engineering
On This Page Jump Links
Off